Difference between revisions of "PAR Protocol from 2014.02.27"

From Lsdf
m
m
Line 8: Line 8:
 
ToDos:
 
ToDos:
 
a. Ahmad will produce a ToDo list for HPSS install.
 
a. Ahmad will produce a ToDo list for HPSS install.
  +
 
b. Ahmad will add a bwLSDF S7S account to store relevant docs about the HPSS
 
b. Ahmad will add a bwLSDF S7S account to store relevant docs about the HPSS
  +
 
c. Dorin will prepare generic slides for the bwDataArchiv KO on 7.4
 
c. Dorin will prepare generic slides for the bwDataArchiv KO on 7.4

Revision as of 10:59, 13 March 2014

Attending: Ahmad, Dorin, Jan

Topics discussed: 1. Intro to projects regarding archives. Update of the slideset 2. Bericht der HPSS workshop


ToDos: a. Ahmad will produce a ToDo list for HPSS install.

b. Ahmad will add a bwLSDF S7S account to store relevant docs about the HPSS

c. Dorin will prepare generic slides for the bwDataArchiv KO on 7.4