hidden:BWA ProjectPlanning item SM1 OS Upgrade

From Lsdf
Revision as of 14:04, 24 November 2015 by Bettina.bauer (talk | contribs) (Doku fehlt)
Jump to navigationJump to search

closed

  • s. Mail Ahmad 18.11.2015
    • Operation System Upgrade (OS Upgrade): Wir haben das HPSS Testsystem (2xServer: Test Core und Test Mover) von Release RHEL-6.4 auf RHEL-6.7 upgraded.
  • Besprechung mit IBM 23.11.2015
    • HPSS Konfiguration dokumentieren