Upgrade Testsystem from 743p2 To 743p3

From Lsdf
Jump to navigationJump to search

1. Backup db has not been made for the test system, have to be done for productive core 1.1 Remove /opt/hpss link

rm -f /opt/hpss

2.cd /root/Software/HPSS/Addon_Packages/

tar -zxvf DBD-DB2-1.85.tar.gz
cd DBD-DB2-1.85
. /var/hpss/hpssdb/sqllib/db2profile
perl Makefile.PL
make
make install

3.

rpm -ivh hpss-clnt-7.4.3.3-0.el6.x86_64.rpm hpss-core-7.4.3.3-0.el6.x86_64.rpm hpss-lib-7.4.3.3-0.el6.x86_64.rpm
hpss-lib-devel-7.4.3.3-0.el6.x86_64.rpm hpss-mvr-7.4.3.3-0.el6.x86_64.rpm rpm -Uvh hpss-doc-7.4.3.3-0.el6.x86_64.rpm --force (try --nodeps before)

4. ln -s /hpss_src/hpss-7.4.3.3-0.el6 /opt/hpss 5. su - hpssdb

. /var/hpss/hpssdb/sqllib/db2profile
db2start
exit

6.. /var/hpss/hpssdb/sqllib/db2profile

/opt/hpss/tools/convert743/hpss/hpss_convertdb743
hpssdb passwd: hpssdb
cnvt> db cfg
CFG> convert all
CFG> quit

7. /opt/hpss/bin/hpss_managetables

hmt> db subsys1
del subsys constraints SSPVHISTORYCON1
hmt> commit
hmt> quit

8. /opt/hpss/tools/convert743/hpss/hpss_convertdb743

cnvt> db subsys1
SUBSYS1> convert all 
Converting NSTRASH...
DB21034E  The command was processed as an SQL statement because it was not a 
valid Command Line Processor command.  During SQL processing it returned:
SQL0624N  Table "HPSS.NSTRASH" already has a primary key or unique constraint 
using the specified columns and periods.  SQLSTATE=42889
Conversion Time: 0 minutes 0 seconds
Done
Converting MPSFORCEMIGRATE...
Conversion Time: 0 minutes 0 seconds
Done
SUBSYS1> state
SUBSYS1> quit

8. /opt/hpss/bin/hpss_managetables

hmt> db subsys1
hmt> add subsys constraints SSPVHISTORYCON1 (error in the Conversion Guide pag. 170 paragraph 10.6.4)
hmt> add subsys constraints NSOBJECTUSERATTRS1 (typo error in the Conversion Guide)
hmt> commit
hmt> quit

9. /opt/hpss/tools/convert743/hpss/hpss_convertdb743

cnvt> db cfg
CFG> cleanup all
CFG> state
CFG> quit

10. /opt/hpss/tools/convert743/hpss/hpss_convertdb743

cnvt> db subsys1
SUBSYS1> cleanup all
SUBSYS1> state
SUBSYS1> quit

11. E2EDP and TOR

11.1 [root@hpsstcr03 hpss_src]# cat /proc/sys/kernel/randomize_va_space 
0
[root@hpsscr sysconfig]# cat /etc/sysctl.conf | grep -i randomize
kernel.randomize_va_space = 0
11.2 /opt/hpss/tools/convert743p3_tor_e2edi/hpss/hpss_convertdb_tor_e2edi
cnvt> db cfg
CFG> convert all
CFG> state
CFG> quit
/opt/hpss/tools/convert743p3_tor_e2edi/hpss/hpss_convertdb_tor_e2edi
cnvt> db subsys1
SUBSYS1> convert all
SUBSYS1> quit
/opt/hpss/tools/convert743p3_tor_e2edi/hpss/hpss_convertdb_tor_e2edi
cnvt> db cfg
CFG> cleanup all
CFG> state
CFG> quit
/opt/hpss/tools/convert743p3_tor_e2edi/hpss/hpss_convertdb_tor_e2edi
cnvt> db subsys1
SUBSYS1> cleanup all
SUBSYS1> state
SUBSYS1> quit

12.Full db backup (not done on the test system)

13. Install the new rpm's on all movers and change /opt/hpss link to the new version