hidden:BWA ProjectPlanning item SM21 Upgrade des Testsystems: Difference between revisions
From Lsdf
Jump to navigationJump to search
(Created page with "* HPSS Telco IBM 14.10.2015") |
(closed Mail Ahmad vom 18.11.2015) |
||
Line 1: | Line 1: | ||
'''closed''' |
|||
* HPSS Telco IBM 14.10.2015 |
* HPSS Telco IBM 14.10.2015 |
||
** - upgrade OS |
|||
*** Need to upgrade to RHEL 6.7... try on the test system first. Upgrading the test core's OS will not affect the ability for testing the P8 movers, as long as the HPSS core services are operational. |
|||
* Mail Ahmad 18.11.2015 |
|||
** 2. Operation System Upgrade (OS Upgrade) |
|||
*** Wir haben das HPSS Testsystem (2xServer: Test Core und Test Mover) von Release RHEL-6.4 auf RHEL-6.7 upgraded. |
Revision as of 17:26, 20 November 2015
closed
- HPSS Telco IBM 14.10.2015
- - upgrade OS
- Need to upgrade to RHEL 6.7... try on the test system first. Upgrading the test core's OS will not affect the ability for testing the P8 movers, as long as the HPSS core services are operational.
- - upgrade OS
- Mail Ahmad 18.11.2015
- 2. Operation System Upgrade (OS Upgrade)
- Wir haben das HPSS Testsystem (2xServer: Test Core und Test Mover) von Release RHEL-6.4 auf RHEL-6.7 upgraded.
- 2. Operation System Upgrade (OS Upgrade)